This action is offered based on the list of operations.
A form serves to enter the information required to complete a work order by copying an operation from:
- a work order template (only the operations of this work order template),
- or of a single operation,
... for a list of equipment or an equipment item (points(s) or asset(s)).
The selected operation/equipment combinations are copied to the selected work order, with a check box to be acknowledged in order to eliminate any duplicates.
Operations
You must enter an operation or initialize a list of work order template operations.
- Sequence: Indicates the order in which the operations are to be performed.
- Operation code: Identifier of the operation, cannot be changed.
- Required: If this box is checked, the work order cannot be finished until this operation has been performed.
- Duration: Expected duration of the operation.
- Name: Comments on the operation, initialized with the general description of the operation.
Equipment
- Equipment code: Identifier of the equipment, cannot be changed.
- Name: Name of the structure point. This name must make it possible to clearly identify the structure point.
- Type: Classification category of the points. The list of Equipment types is configurable.
- Status: Current status of the structure point.
- Template: When a template is assigned, a pop-up window suggests creating elements from the template: Reading points, characteristics and Work order plan (if work orders are authorized for the point).
- Main parent: the principal parent.
- Geographic parent: the parent in geographic terms.