This tab contains information that will be used to create the work order covering the job described by the Project template.
- Project template: Identifier of the project template, unique in the application.
- Name: Name of the project template. It is used to specify the content and may be useful when searching for project templates.
Work order
Equipment
You can specify an equipment item in the work order template, if the work order template is intended for a single equipment item.
The work orders in the project may refer to separate items of equipment.
- Location point: Location for which the project template is defined.
- Main point: The main point for which the project template is defined.
- Asset: To be selected or entered if the project template only applies to a given asset.
- Template: To be selected or entered if the project template valid for a set of equipment with the same template.
- Family: Family of templates to which the project template refers.
Additional information
- Organization: Organization to which the work order is assigned.
- Planned workload: Sum of the durations of the resources estimated on the work order templates constituting the project template.
- Last change: Save date of the last change to the project template.
- Changed by: User having made the last change.