A work order template may relate to one item of equipment and the associated operations may relate to different items of equipment.
By means of examples, this page describes the functional rules applied to determine which data are retrieved on work orders and operations
These rules apply when a work order template is used to initiate a work order through a work order duplication but also when launching work order plans.
Description of the scenarios using this work order template:
Example 1
Triggering a work order plan involving a structure point and a work order initiated by this work order template.
|
SEQ. |
OPERATION |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | |
| 30 | DEM |
|
SEQ. |
operation |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | GENERATOR |
| 30 | DEM | GENERATOR |
Example 2
Triggering a work order plan for an Asset and a work order initiated by this work order template.
|
SEQ. |
OPERATION |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | |
| 30 | DEM |
|
SEQ. |
operation |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | |
| 30 | DEM | CHAUD (boiler) | Main parent of the BOILER asset |
Example 3
Triggering without equipment with a work order template for a structure point and operations with equipment.
|
SEQ. |
OPERATION |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | |
| 30 | DEM |
|
SEQ. |
operation |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | GENERATOR |
| 30 | DEM | GENERATOR |
Example 4
Triggering without an item of equipment with a work order template for the Asset and operations with equipment.
|
SEQ. |
OPERATION |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | |
| 30 | DEM |
|
SEQ. |
operation |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | |
| 30 | DEM | CHAUD (boiler) | Main parent of the BOILER asset |
Example 5
Duplication of a work order initiated by this work order template from an asset.
|
SEQ. |
OPERATION |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | |
| 30 | DEM |
|
SEQ. |
operation |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | |
| 30 | DEM | 670CSI69 | Main parent of asset 670CSI69 |
Example 6
Duplication of a work order initiated by this work order template from a structure point.
|
SEQ. |
OPERATION |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | |
| 30 | DEM |
|
SEQ. |
operation |
ASSET |
STRUCTURE POINT |
| 10 | DEM | ILOT_PROD-152 | |
| 20 | DEM | 670CSI69 | |
| 30 | DEM | ILOT_PROD-151 |