This screen displays periods of unavailability for referring assets.
Header
- Start date: Date when the graph starts. Initialized with the start date indicated on the search tab.
- At least one unavailability: Check to limit the display to assets having at least one period of unavailability known as of the start date.
- Display the calendar: Clear so as not to view the Calendar of the Asset.
Click on the "Update" button to refresh the graph with these settings.
List of Assets
- Asset, Name: Code and name of the asset,
- Start date: Start date of the first unavailability of the period.
- End date: End date of the last known unavailability.
Calendar
- Zoom: The zoom out
and in
functions allow you to go from one time scale to another; for example: 2 hours/6 hours, day/week.
The default scale can be configured in the dictionary.
- Shift: In order to set the date range, use the horizontal arrows

to go forward and 
to recalculate. The shift depends on the zoom level.
General diagram
- Unavailability bar: The bar reflects the period when the Asset is not available.
The color is different depending on whether the unavailability is use to a WR or a work order without a WR. The colors can be set in Customization of names: cfg_Color_MR and cfg_Color_WO.
- Calendar border: The border takes on the color of the range defined on the Calendar of the Asset.
The height and location (at the top or bottom) of the border can be configured in Customization of names: cfg_EqpCal_Style.
For example: height: 5px; border-bottom: 13px solid {0};.
The sum of the height and thickness must be 18px.
- Number of assets available: Number of Assets on the list - number of assets unavailable, for the time range.
Unavailability details
Clicking on a bar in the diagram displays details on the causes of the corresponding Asset 's unavailability.
To close this detail pane, click on
.
List of WRs/Work order
- Work order/WR and Name: WR code and name not taken into account or the work order.
-
Start:
- WR: Date created
- Work order: Start date
-
End:
- WR: Desired end date
- Work order: End date
Chart
- Bar: The bars represent the desired duration of the WR or the planned duration of the work order.
Work order bars can be moved and changed as in the
macroplanning, unless they represent closed work orders or work orders with fixed dates; in this case, the bars are then framed by 2 black lines.