This form lists the history of asset movements made as part of this work order.
- Date: Move date.
- Moved asset: Asset moved or scrapped.
- Action: Move or scrapping.
- New parent type: Structure of the equipment in which the Asset was moved.
- New parent: Equipment to which the Asset was moved.
- Replacement asset: Asset that was placed in the former location as a replacement.
- Technician: Technician having moved or scrapped the Asset.