The purpose of this form is to facilitate the assignment of teams to work orders.
This is generally done after having specified the required disciplines on the list of resources for the work order, with the number of hours, but not necessarily. See Work order [Completed] [Labour].

For more information about the use of this form, see Team assignment principles.

To ensure the consistency of the displayed data, changes are saved with each change of a tab or form.

 

Display settings

Same principle as for macroplanning, with two additional settings:

 

Calendar

 

Anticipated resources

This list contains one line per resource need expressed for the work order on the Work order [Completed] [Labor] tab.
If no resource has been defined, the work order is on a line (except if the "Hide lines without resources" box is checked).
The line is highlighted in yellow if it refers to a resource for which a team has not been specified. This means that at least one resource line must have been entered on the work order.

You can modify or enter the workload for the selected resource on the date of the need, if it is included in the work order dates.

 

Relationship between lists

To know which team is assigned or the teams that can be assigned:

  1. Select them by checking one or more resource lines.
  2. Click on See possible TEAMS.

 

Availability of teams

This list contains the teams that can be assigned to all the selected resources. Consequently, these teams necessarily contain at least:

If the team is that of the resource, the box is checked.
If you want to assign the team to the resource, tick it and click on "Assign/Unassign TEAMS.