In this tab, you can add one or more addresses to describe this work order.
Clicking the add icon in the table header automatically adds a row to the list.
At the bottom of the screen, you can enter the number and the designation (Bis or Ter) if necessary. Then,
A checkbox allows you to enter the address "Main".
There can only be one address "Main"; if you select multiple addresses such as "Main", a blocking message will appear during registration.
The main address of the Asset (or Structure point) to which the work order pertains is automatically imported into this tab.
allows you to switch to the GIS map at the listed address.
allows you to change the primary address of a work order directly on the Map.