Prerequisites
- To have created a discipline with the "material resource" cost type.
- To have at least one time type and one calendar availability.
Procedure
- In the [Resources]module, select the [Material resources] function.
→ The list of material resources is displayed.
- Click on the add icon
(also accessible from the result or detail form).
→ The material resource detail form is displayed in creation mode. See Material resources [General].
- Enter a discipline (required field), and optionally a time type, and then save.
→ The fields change to read-only.
Comment: A material resource can also be created directly from the detail form for an Asset, a Main point or a geographic point.
A material resource can also be created directly from the detail form for an Asset, a Main point or a geographic point.
Link with an equipment item
- Selecting equipment:
→ The equipment is linked and its calendar is used by the material resource.