Typical week
Resources > Typical week

A standard week can be used to define availability schedules that can be applied to a set without the need to define these availabilities specifically for each member of the set.

A typical week is presented in the form of a graphic calendar, which can be easily updated.

Standard days and times can be configured in the module settings (all settings whose code begins with ST_).

As an initial application, this typical week can be applied to an optimization model, and will make it possible to define the availability schedules of technicians globally, without having to define them for each individual technician.

Export and duplicate actions are available through the function.

Creating a typical week

  1. In the [Resources] module, select the [Typical week] function.
    → The list of typical weeks is displayed.

  2. Click on the add icon (also accessible from the result or detail form).
    → The typical week details form is displayed in creation mode. See Typical week [General].

  3. Populate the required fields and save.

Changing a typical week

  1. In the [Resources] module, select the [[Technician] function.
    → The list of technicians is displayed.

  2. Select the [Criteria] tab, enter the search criteria and click the [Results] tab.
    → The list of typical weeks corresponding to your search criteria is displayed.
  3. Click on a typical week to be changed.
    → The detail form of a typical week is displayed. For details on the contents, see Typical week [General].
  4. Change the fields that can be changed, then click on the confirm icon .
    → The application closes the form and returns to the list.
You can define a typical week on a day by day basis, or over a range of several days at a time.