See Result form.
This form contains the list of Plans that can be used in a Plan Configuration. The plans come from the Equipment Zip Import.
- Plans (mandatory): Plan identifier.
- Label: Plan description.
- Structure (mandatory): Structure associated with the plan. By default, it is a floor.
- Import date: Date when the equipment synchronization was performed.
- Associated structure point: Structure point associated with the plan. By default, it is a floor. This information comes from the equipment synchronization.
- Version (non-editable): Plan version number. Each time a plan is updated through equipment import, the version number is incremented. If the plan with version n is not used in a Plan Configuration, then the plan with version n+1 replaces the previous version. If the plan with version n is already used in a Plan Configuration, then the plan with version n+1 is added. The plan version n+1 is directly propagated to the Plan Configuration.
A plan can be associated with a Plan Configuration only if the Import date and Associated structure point information is provided.