Equipment assets tree structure
| Why can't equipment with "canceled" (or "to be deleted") status be moved in the tree structure? |
|
The standard workflows do not allow changes for points and Assets with "canceled" (or "to be deleted") status. As a move is considered as a change, it is not permitted when the equipment is in this status.
To allow canceled equipment to be moved, a specific workflow must be created that allows changes when the status is "canceled."
|
Structure points
| The equipment follow-up is blank for an additional structure point even though work orders have been created. |
|
In the structure you have created, you must check the "Tree search" box."
Work orders created after this modification will be displayed in the equipment follow-up.
|
Reading points
| Certain fields of my reading point cannot be changed. Why? |
|
These are either fields inherited from the reading point template or they are fields that do not correspond to the type of reading point,: "meter" or "simple." See Reading point,: Detail form.
|
Measurement readings
| I made a mistake in the reading value. How can I correct it? |
|
Take another reading by checking the "Correction" box.
See Taking a measurement reading.
|