This action is to be carried out if the "Work acceptance" box is checked on the WR; see WR statuses.
Prerequisites
- the WR is related to a work order having the "Closed" status.
Procedure
- In the [Work] module, select the [WR search] function.
→ The list of WRs is displayed.
- Select the [Criteria] tab, enter the search criteria (with State = "Finished") and click the [Results] tab.
→ The list of WRs corresponding to your search criteria is displayed.
- Click on the WR.
→ The detail form of the WR is displayed.
- Then select the desired action on the status menu
.
→ The action menu is displayed. It contains the items:
- Accept the work,
- Reject the work.
- If the WR can be closed, select [Accept the work]
→ the WR changes to the "Closed" status
- If performance of the work does not allow the WR to be closed, select [Reject the work]
→ the WR changes to the "Not yet taken into account" state and the link between the WR/Work order is deleted. The work order that was linked remains in the "Closed" state.